An extension to the existing industrial unit
The map marker may not show the precise location of the application. Map locations are, where possible, taken from the official coordinates of the relevant Unique Property Reference Number (UPRN), as published in the OS OpenUPRN database. In some cases, particularly where there is a planning application on open land not linked to an existing property, they may be estimated from the location description or taken from the OS coordinates given in the planning application.
View this application at the Wychavon Planning Portal
Description: An extension to the existing industrial unit
Status: Approval
Applicant Name
Mr Alex Henney, Pigeon Enterprises Ltd
Application Location
Unit 2
Asparagus Point
Asparagus Way
Vale Park
Evesham
WR11 1GN
UPRN
Ward
Little Hampton Ward - Pre 01/05/23
Parish
Evesham
Agent Name
Mr Alastair Thornton, Simply Planning Limited
Agent Address
Third Floor Suite
Front Office
Victoria House 114-116 Colmore Row
Birmingham
B3 3BD
Application Reference: W/22/02442/FUL
Application Type: Full planning permission
Case Officer: Gavin Greenhow
Decision Level: Delegated
Application Received Date: Friday 11 November 2022
Application Valid Date: Friday 11 November 2022
Consultation Start Date: Thursday 24 November 2022
Consultation End Date: Friday 30 December 2022
Site Visit Notice Date: N/A
Advert Expiry Date: N/A
Committee Date: N/A
Decision Date: Thursday 9 February 2023
Appeal Date: N/A
Appeal Decision: N/A
Application documents are not linked directly from this website. To download and view documents, please visit the Wychavon Planning Portal.
The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To conform with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
Prior to the first use/occupation of the development hereby permitted, the details set out in the OES Consulting Preliminary Drainage Plan (reference 22120-C002) shall be fully implemented and remain thereafter. Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDP29 of the South Worcestershire Development Plan.
Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents –
Align Architecture drawing numbers PA 01; PA 02; PA 03; PA 04; PA 05; PA 06; PA 07; PA 08; PA 09; PA 10; PA 11; PA 12
Reason: To define the permission.
Positive and Proactive Statement.
In dealing with this application, the Council has worked with the applicant in the following ways:
- seeking further information following receipt of the application; and
- considering the imposition of conditions.
In such ways the Council has demonstrated a positive and proactive manner in seeking solutions to problems arising in relation to the planning application.
W/25/01539/NMA
Unit 2, Asparagus Point, Asparagus Way, Vale Park, Evesham, WR11 1GN
Non-material amendment to W/22/02442/FUL for roof design and relocation of fire exit door
Added Friday 18 July 2025
Decision: Approval
Decided Monday 21 July 2025
W/24/02562/NMA
Unit 2, Asparagus Point, Asparagus Way, Vale Park, Evesham, WR11 1GN
Non-material amendment following a grant of planning permission W/22/02442/FUL to
Added Thursday 19 December 2024
Decision: Approval
Decided Monday 30 December 2024
W/25/01352/FUL
Unit 1, Asparagus Point, Asparagus Way, Vale Park, Evesham, WR11 1GN
Retrospective application for the installation of a temporary building on pre-existing hard surface.
Added Tuesday 2 September 2025
Decision: Approval
Decided Monday 20 October 2025
W/22/01165/GPJ
Unit 410, Bramley Drive, Evesham, WR11 1JH
Notification for Prior Approval for Installation of 191.5kW solar PV system comprising of 504 x Canadian Solar 380w panels.
Added Tuesday 17 May 2022
Decision: General Permitted Dev (Conditional)
Decided Monday 27 June 2022