Scheduled work by Severn Trent Water from Tuesday 21 July 2026 to Thursday 23 July 2026
Marker may not indicate precise location of the roadworks.
Description: 2 x Leg damage from directional drilling unit.
2 x Grab waggon damage.
Damaged plastic boundary boxes due to over riding by heavy vehicles. Replace 2 plastic boundary boxes with steel topsoil and seed required.
Opposite Greengates/Opposite 3 Harvington Mews/Opposite entrance to Harvington Mews 3 x Failure: 250 carriageway proximity rule: 1.3 X 0.3m 14mm HRA and chippings patch required plus 1.3m replacement of white Line.
Tyre track damage. 3 x 0.7m 14mm HRA and chippings patch required
Start: Tuesday 21 July 2026 23:00
Finish: Thursday 23 July 2026 22:59
Start and finish times are subject to change
Location: Alcester Road
Traffic management: Traffic control (two-way signals)
Effect on traffic: Delays possible
Effect on footway: Provide Pedestrian Walkway
Works reference: LB62572588237
Permit reference: LB62572588237-03
Responsible organisation: Severn Trent Water
Highways authority: Worcestershire County Council
Works Type: Remedial Works
Work Category: Scheduled works
Status: Advance planning