Demolition of existing barn, and construction of dwelling together with garage and all associated works including change of use of agricultural land to garden area/amenity space for dwelling, rear single storey extension and replacement of flat roof with pitched roof (in lieu of existing Class Q consent). (Variation of condition 2 Ref W/24/00865/FUL)
The map marker may not show the precise location of the application. Map locations are, where possible, taken from the official coordinates of the relevant Unique Property Reference Number (UPRN), as published in the OS OpenUPRN database. In some cases, particularly where there is a planning application on open land not linked to an existing property, they may be estimated from the location description or taken from the OS coordinates given in the planning application.
View this application at the Wychavon Planning Portal
Description: Demolition of existing barn, and construction of dwelling together with garage and all associated works including change of use of agricultural land to garden area/amenity space for dwelling, rear single storey extension and replacement of flat roof with pitched roof (in lieu of existing Class Q consent). (Variation of condition 2 Ref W/24/00865/FUL)
Status: Approval
Applicant Name
Mr M Cook
Application Location
Land And Barn At (os 0578 4581)
Leasowes Road
Offenham
WR11 8RQ
UPRN
Ward
Bretforton & Offenham Ward
Parish
Offenham
Agent Name
Mr Sam Russell, Sam Russell Architectural Design and Planning
Agent Address
2 St Davids Walk
Newbold-On-Stour
Stratford upon Avon
CV37 8UT
Application Reference: W/25/01786/FUL
Application Type: Full planning permission
Case Officer: Charlotte Barry
Decision Level: Delegated
Application Received Date: Wednesday 20 August 2025
Application Valid Date: Thursday 21 August 2025
Consultation Start Date: Monday 20 October 2025
Consultation End Date: Monday 10 November 2025
Site Visit Notice Date: N/A
Advert Expiry Date: Thursday 25 September 2025
Committee Date: N/A
Decision Date: Thursday 20 November 2025
Appeal Date: N/A
Appeal Decision: N/A
Application documents are not linked directly from this website. To download and view documents, please visit the Wychavon Planning Portal.
The development hereby permitted must be commenced not later than the expiration of three years from the date of the original permission (W/24/00865/FUL) which was granted permission on the 27th August 2024. Reason: To conform with the requirements of Sections 73 and 91 of the Town and Country Planning Act 1990 (as amended).
Unless where required or allowed by other conditions attached to this permission/consent, the development hereby approved shall be carried out in accordance with the information (including details on the proposed materials) provided on the application form and the following plans/drawings/documents –
Site Location Plan 2468 - P3 - Received 3 May 2024
Proposed Site Block Plan 2468 - B2 - Received 3 May 2024
Proposed Plans and Elevations - 2468-B1 Rev C
Reason: In order to define the permission in accordance with Policy SWDP1 and SWDP2 of the South Worcestershire Development Plan and the National Planning Policy Framework.
Prior to the first use/occupation of the development hereby permitted, the details set out in the submitted Water Management Statement shall be fully implemented and remain thereafter. Reason: To ensure that an appropriate sustainable drainage system is provided to serve the development in accordance with policy SWDP29 of the South Worcestershire Development Plan 2016.
The detached garage hereby permitted with this development shall not be occupied at any time other than for purposes ancillary to the residential use of the dwelling hereby approved. The garage shall not be used as an independent self contained dwelling, nor for any business or commercial use separate from the host dwelling.
Reason - In the interests of sustainable development and to preserve the amenities of the locality in accordance with Policy SWDP1 and SWDP21 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
The details contained within the approved 'Biodiversity Net Gain Assessment' produced by Arbtech (01.07.24) shall be implemented in accordance with the timescale outlined within the Assessment and maintained thereafter in accordance with the approved LEMP.
Reason: To ensure that the proposed development contributes to the conservation and enhancement of biodiversity in accordance with policies SWDP21, SWDP22 and SWDP25 of the South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
The Landscape Enhancement and Management Plan produced by Arbtech and dated 22nd October 2024 approved as part of application W/25/00223/CCO shall be implemented in accordance with the approved details.
Reason: To ensure that the proposed development contributes to the conservation and enhancement of biodiversity within the site, and to ensure the proposal harmonises with the surroundings in accordance with policies SWDP21, SWDP22 and SWDP25 of the South Worcestershire Development Plan 2016.
The soft landscaping scheme as approved as part of application W/25/00223/CCO and shown on Drawing Drg No. 2468-A04.1, Rev. A shall be implemented in accordance with the approved details.
All planting and seeding/turfing shall be carried out in accordance with the approved details in the first planting and seeding/turfing seasons following the completion or first occupation/use of the development, whichever is the sooner. The planting shall be maintained in accordance with the approved schedule of maintenance. Any trees or plants which, within a period of five years from the completion of the planting, die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species.
Reason - To ensure the proposed development does not have an adverse effect on the character and appearance of the area in accordance with policies SWDP21 and SWDP25 of South Worcestershire Development Plan and the relevant aims and objectives of the National Planning Policy Framework.
The development hereby approved shall be carried out in accordance with the Energy Calculation Worksheet by Sladden and Barton approved as part of application W/25/00223/CCO.
Reason - To ensure the development supports the delivery of low carbon/renewable energy and safeguards natural resources in accordance with policy SWDP27 of the South Worcestershire Development Plan.
The cycle parking facilities for 3 cycles conforming to parking standards set out within Worcestershire's Streetscape Design Guide shall be completed in accordance with the details approved on Drawing Drg No. 2468-A04.1, Rev. A as part of application W/25/00223/CCO. The cycle parking shall not thereafter be used for any other purpose.
REASON: In the interests of providing adequate cycle parking provision within the curtilage of the dwelling house.
In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported immediately to the Local Planning Authority. The applicant is advised to immediately seek the advice of an independent geo-environmental consultant experienced in contaminated land risk assessment, including intrusive investigations and remediation.
No further works should be undertaken in the areas of suspected contamination, other than that work required to be carried out as part of an approved remediation scheme, unless otherwise agreed by the Local Planning Authority, until requirements 1 to 4 below have been complied with:
1. Detailed site investigation and risk assessment must be undertaken by competent persons in accordance with the Environment Agency's 'Land Contamination: Risk Management' guidance and a written report of the findings produced. The risk assessment must be designed
to assess the nature and extent of suspected contamination and approved by the Local Planning Authority prior to any further development taking place.
2. Where identified as necessary, a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to identified receptors must be prepared and is subject to the approval of the Local Planning Authority in advance of
undertaking. The remediation scheme must ensure that the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990 in relation to the intended use of the land after remediation.
3. The approved remediation scheme must be carried out in accordance with its terms prior to the re-commencement of any site works in the areas of suspected contamination, other than that work required to carry out remediation, unless otherwise agreed in writing by the Local
Planning Authority.
4. Following completion of measures identified in the approved remediation scheme a verification report that demonstrates the effectiveness of the remediation carried out must be produced and is subject to the approval of the Local Planning Authority prior to the occupation of
any buildings on site.
REASON: To ensure that the risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property, and ecosystems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors and to accord with Policy SWDP31 and the relevant aims and objectives of the National Planning Policy Framework.
The development shall not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the Written Scheme of Investigation approved under condition (A) as part of application W/25/00223/CCO and the provision made for analysis, publication and dissemination of results and archive deposition has been secured.
Reason: In accordance with the requirements of the National Planning Policy Framework 2012 (as amended) and Policies SWDP6 and SWDP24 of the South Worcestershire Development Plan.
This permission does not authorise the Applicant to carry out works within the publicly maintained highway since such works can only be carried out by the County Council’s Approved Contractor, Ringway Infrastructure Service who can be contacted by email [email protected]. The Applicant is solely responsible for all costs associated with construction of the access.
In accordance with the provisions in the Town and Country Planning (Development Management Procedure) (England) Order 2015 and pursuant to paragraph 38 of the National Planning Policy Framework, where possible and feasible, either through discussions, negotiations or in the consideration and assessment of this application and the accompanying proposals, the council as the local planning authority endeavoured to work with the applicant/developer in a positive and proactive way to ensure that the approved development is
consistent with the relevant provisions in the framework.
Any Air Source Heat Pump should be located on the west or rear of the proposed dwelling.
Work should avoid disturbance to nesting birds. Nesting birds are protected under the 1981 Wildlife and Countryside Act and the Countryside and Rights of Way Act 2000. The main nesting season lasts approximately from March to September, so work should take place outside these dates if at all possible. However, birds can nest at any time and the site including any buildings should ideally be checked for their presence immediately before work starts.
Buildings are frequently used as roosting sites by bats. Bats and their 'roost' sites are protected under the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017, the latter of which deems them a European Protected Species. It is a criminal offence to deliberately kill or injure a bat, to disturb or destroy a bat roost or to obstruct an entrance to a roost. If evidence of bats is found, work should stop immediately and Natural England must be contacted on 0845 6003078 for advice on the best way to proceed. All contractors working on site should be made aware of the advice and provided with the relevant contact details.
W/25/00223/CCO
Land And Barn At (Os 0578 4581), Leasowes Road, Offenham
Discharge of Conditions 6 (LEMP), 7 (Landscaping Scheme), 8 (Renewable/Low Carbon Energy), 9 (Cycle Parking) and 12 (WSI) of Planning Permission number W/24/00865/FUL
Added Tuesday 4 February 2025
Decision: Approval
Decided Thursday 6 March 2025
W/24/00865/FUL
Land And Barn At (Os 0578 4581), Leasowes Road, Offenham
Demolition of existing barn, and construction of dwelling together with garage and all associated works including change of use of agricultural land to garden area/amenity space for dwelling, rear single storey extension and replacement of flat roof with pitched roof (in lieu of existing Class Q consent).
Added Tuesday 2 July 2024
Decision: Approval
Decided Tuesday 27 August 2024
W/23/02319/GPDQ
Land And Barn At (OS 0578 4581), Leasowes Road, Offenham
Notification for Prior Approval for the proposed change of use of an Agricultural Building to a Dwellinghouse (Class C3), and for building operations reasonably necessary for the conversion.
Added Monday 13 November 2023
Decision: Approval
Decided Tuesday 9 January 2024
W/25/01307/CCO
Apple Tree Barn, Leasowes Road, Offenham, Evesham, WR11 8RQ
Discharge of Conditions 5 (Materials); 8 (Renewable/low carbon energy); 12 (1-6) (Land Contamination) of planning permission W/23/01911/FUL.
Added Friday 20 June 2025
Decision: Approval
Decided Monday 30 June 2025
W/23/01911/FUL
Apple Tree Barn, Leasowes Road, Offenham, Evesham, WR11 8RQ
Full Planning Application for the Demolition and Redevelopment of a Class Q consented building and its replacement with a new dwelling at Land off Leasowes Road, Offenham.
Added Tuesday 3 October 2023
Decision: Approval
Decided Tuesday 6 February 2024
W/23/00756/GPDQ
LAND AND BUILDING AT (OS 0578 4585), LEASOWES ROAD, OFFENHAM
Notification for Prior Approval for the change of use of an agricultural building into one dwelling (C3) and associated operational development.
Added Wednesday 12 April 2023
Decision: Approval
Decided Tuesday 6 June 2023
W/22/00901/HP
3 Leasowes Road, Offenham, Evesham, WR11 8RQ
Ground Floor Rear Extension
Added Thursday 21 April 2022
Decision: Approval
Decided Monday 13 June 2022